Baselining of the existing building’s environmental performance was completed prior to commencement and repeated at the end of each design phase to track improvement. The outcome was a new fa?ade that performed significantly better than BCA Section J 2017, greater than 40% improvement at controlling solar gain than the original, and a reduction in cooling demand by more than 20%. This evolved into a strategy for public art integration, significant improvement of the performance of the building skin, and future-proofing the entire building through upgrading its services infrastructure.
0人已收藏
0人已打赏
免费0人已点赞
分享
回帖成功
经验值 +10
全部回复(0)
只看楼主 我来说两句抢沙发